 |
 |
The Art Building is part of The Arts Center which was
constructed in two phases.
The Music Building was built in 1962. An addition, built in 1968,
includes the Theatre, Lecture Hall, and Art Building.
The Art Building contains over 40,000 square feet for art education, ceramics, sculpture, metals
and fibers. It also houses administrative offices for the School of The
Arts.
|

Art Building (The Arts Center)
2400 E. Kenwood Blvd.
Built: 1962
Cost: $ 1,840,692
Architect: Eschweiler & Eschweiler
Addition (Theater, Lecture Hall, and Art Building)
2400 E. Kenwood Blvd.
Built: 1968
Cost: $ 4,097,224
Architect: Eschweiler & Eschweiler

 |